{"id":5126,"date":"2020-07-23T15:40:00","date_gmt":"2020-07-23T07:40:00","guid":{"rendered":"https:\/\/mysourcify.com\/?p=5126"},"modified":"2026-06-12T07:43:59","modified_gmt":"2026-06-12T07:43:59","slug":"production-and-quality-control-importing-from-china-course-step-4","status":"publish","type":"post","link":"https:\/\/mysourcify.com\/fr\/production-and-quality-control-importing-from-china-course-step-4\/","title":{"rendered":"Production &amp; Quality Control-Importing from China Course Step 4 (2026)"},"content":{"rendered":"<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Comment v\u00e9rifier la qualit\u00e9 de vos produits ? (Partie 4) II Faire des affaires en Chine\" width=\"800\" height=\"450\" src=\"https:\/\/www.youtube.com\/embed\/tfdA7Iiii_k?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p>Here we finally get to the most critical part: making sure the supplier actually produces your goods exactly as expected.<\/p>\n\n\n\n<p>It is common for some Chinese suppliers to agree to every single request <em>before<\/em> receiving your order and deposit. But once production starts, things can easily spiral out of control. Once you pay the deposit, you lose a significant amount of your leverage.<\/p>\n\n\n\n<p>This guide is aimed at showing you exactly how to regain that control, guarantee product quality, and keep your production schedule on track.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-production-step-by-step-guide\">Guide de production \u00e9tape par \u00e9tape<\/h2>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>\u00c9tapes<\/strong><\/td><td><strong>Comment<\/strong><\/td><\/tr><tr><td><strong>1. Contrat de commande<\/strong><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Se laisser tenter par le contrat<\/span><\/strong><span style=\"color:#e5a400\" class=\"has-inline-color\"><strong>.<\/strong> <\/span>Vous devez r\u00e9diger un contrat de commande lorsque vous avez choisi votre fournisseur. Un bon contrat peut vous aider \u00e0 vous d\u00e9barrasser de nombreux probl\u00e8mes potentiels.<\/td><\/tr><tr><td><strong>4. Inspection avant exp\u00e9dition<\/strong><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Inspection avant exp\u00e9dition.<\/span> <\/strong>It&#8217;s the last quality check of the mass cargoes before the shipment. This time, you mainly aim to check the package, label, and product quality as well.<\/td><\/tr><tr><td><strong>3. inspection en ligne<\/strong><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Contr\u00f4le de la qualit\u00e9 de la production.<\/span><\/strong> V\u00e9rifier la qualit\u00e9 pendant la production en s\u00e9rie, c'est s'assurer que votre commande respecte le calendrier pr\u00e9vu. Parall\u00e8lement, vous devez v\u00e9rifier si la qualit\u00e9 de l'\u00e9chantillon de la production de masse est conforme \u00e0 celle de l'\u00e9chantillon PP.<\/td><\/tr><tr><td><strong>4. inspection avant exp\u00e9dition<\/strong><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Inspection avant exp\u00e9dition.<\/span> <\/strong>Il s'agit du dernier contr\u00f4le de qualit\u00e9 des cargaisons de masse avant l'exp\u00e9dition. Cette fois, il s'agit de v\u00e9rifier la qualit\u00e9 de l'emballage, de l'\u00e9tiquette et du produit.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-1-purchase-order-contract\">1. Contrat de commande<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/mysourcify.com\/wp-content\/uploads\/2020\/07\/contract-1024x683.jpg\" alt=\"purchase order contract\" class=\"wp-image-5131\"\/><figcaption class=\"wp-element-caption\">contrat de commande<\/figcaption><\/figure>\n\n\n\n<p>There is no such thing as a perfect contract, but a well-drafted one can easily solve or prevent major disputes. Below are the recommended terms you must include in your Purchase Order (PO).<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>The signature of the representative of the supplier<\/td><td><strong>Conditions<\/strong><\/td><td><strong>Description<\/strong><\/td><\/tr><tr><td><strong>En-t\u00eate<\/strong><\/td><td>TO\/Vender :<\/td><td>ABC Company ltd<br>123 Hexie Road<br>Yiwu, Zhejiang, CN 310000<\/td><\/tr><tr><td><\/td><td>Exp\u00e9dier \u00e0 :<\/td><td>ABC Company, Inc<br>123 Great Street Drive<br>Wonderland, \u00c9tats-Unis 45678<br>TEL\/FAZ : +1 407 ***<\/td><\/tr><tr><td><\/td><td>Date. S\/N No.<\/td><td>25 octobre 2016, S\/N:20160501A<\/td><\/tr><tr><td><strong>G\u00e9n\u00e9ral<\/strong><\/td><td>Sp\u00e9cifications du produit<\/td><td>a. Nom du produit<br>b. Photo<br>c. Dimensions<br>d. Mat\u00e9riau et couleur<br>e. Emballage et \u00e9tiquetage<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">D\u00e9lai d'ex\u00e9cution<\/span><\/strong><\/td><td><span style=\"color:#008cc4\" class=\"has-inline-color\">Le d\u00e9lai de production \u00e0 partir du paiement de l'acompte.<\/span><\/td><\/tr><tr><td><\/td><td>Exigences environnementales<\/td><td>Ils peuvent \u00eatre conformes aux exigences environnementales de votre pays.<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#f23400\" class=\"has-inline-color\">Droits d'auteur, brevets et redevances<\/span><\/strong><\/td><td><span style=\"color:#008cc4\" class=\"has-inline-color\">Le fournisseur ne peut pas distribuer ou vendre commercialement le produit et sa conception \u00e0 un tiers.<\/span><\/td><\/tr><tr><td><strong>\u00c9tat des marchandises<\/strong><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Contr\u00f4le de la qualit\u00e9<\/span><\/strong><\/td><td>a. <span style=\"color:#008cc4\" class=\"has-inline-color\">Les produits doivent \u00eatre conformes aux sp\u00e9cifications prescrites.<\/span> Si le produit final ne r\u00e9pond pas aux normes de qualit\u00e9, <span style=\"color:#f23400\" class=\"has-inline-color\">nous avons le droit de rejeter les marchandises, et tous les frais encourus doivent \u00eatre \u00e0 la charge du fournisseur<\/span>.<br>b. Nous avons le droit de confier \u00e0 un institut tiers l'inspection de la cargaison pendant la production.<br>c. Nous avons le droit de retarder le paiement du solde jusqu'\u00e0 ce que nous recevions un rapport d'inspection de la qualit\u00e9 r\u00e9el et efficace.<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">D\u00e9fauts<\/span><\/strong><\/td><td>Le taux de d\u00e9fectuosit\u00e9 varie selon les cat\u00e9gories de produits. <span style=\"color:#008cc4\" class=\"has-inline-color\">Il se situe g\u00e9n\u00e9ralement autour de 1%<\/span>. Le pourcentage inf\u00e9rieur de certains produits, tels que<span style=\"color:#008cc4\" class=\"has-inline-color\"> accessoires bon march\u00e9, peut-\u00eatre autour de 5%<\/span>.<\/td><\/tr><tr><td><\/td><td>Tests de conformit\u00e9<\/td><td><span style=\"color:#f23400\" class=\"has-inline-color\">Vous devez pr\u00e9ciser que vous avez besoin d'un produit qualifi\u00e9 ou simplement du certificat lui-m\u00eame.<\/span> Dans un cas, il existe un v\u00e9ritable certificat pour vous, mais le produit lui-m\u00eame n'a pas besoin de passer le test.<\/td><\/tr><tr><td><strong>Factures et paiements<\/strong><\/td><td>Factures<\/td><td>Toutes les factures doivent indiquer clairement le montant de la commande et tous les frais \u00e0 la charge de l'acheteur.<\/td><\/tr><tr><td><\/td><td>Conditions de paiement<\/td><td>N\u00e9gocier le d\u00e9lai de paiement.<\/td><\/tr><tr><td><\/td><td>D\u00e9p\u00f4t<\/td><td>D\u00e9p\u00f4t : 30% TT (le cas \u00e9ch\u00e9ant)<\/td><\/tr><tr><td><\/td><td>\u00c9quilibre<\/td><td>Avant l'exp\u00e9dition ou contre la copie du B\/L<\/td><\/tr><tr><td><strong>Livraison<\/strong><\/td><td>Conditions de transport<\/td><td>Transport maritime, Transport a\u00e9rien, Transport ferroviaire<\/td><\/tr><tr><td><\/td><td>Conditions d'exportation<\/td><td>EXW, <a href=\"https:\/\/mysourcify.com\/fr\/what-does-fob-stand-for-in-shipping\/\" target=\"_blank\" rel=\"noreferrer noopener\">FOB<\/a>, CIF, DAP<\/td><\/tr><tr><td><\/td><td>Paquet<\/td><td>a. Carton ext\u00e9rieur<br>b. Marque d'exp\u00e9dition<br>c. Palette ou sac textile<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Documents<\/span><\/strong><\/td><td>a. <span style=\"color:#008cc4\" class=\"has-inline-color\">Lettre de voiture<\/span><br>b. <span style=\"color:#008cc4\" class=\"has-inline-color\">Facture commerciale<\/span><br>c. <span style=\"color:#008cc4\" class=\"has-inline-color\">Liste de colisage<\/span><br>d. Pays d'origine\/Formule A<br>e. Certificat de fumigation<br>f. <span style=\"color:#008cc4\" class=\"has-inline-color\">Autres documents<\/span><\/td><\/tr><tr><td><\/td><td>Assurance<\/td><td>Pr\u00e9cisez si vous avez besoin d'une assurance, d'une exp\u00e9dition partielle et\/ou d'une responsabilit\u00e9 du fait des produits ou non.<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Clause de retard de livraison<\/span><\/strong><\/td><td>D\u00e9duire la p\u00e9nalit\u00e9 du paiement du solde \u00e0 un certain taux par jour.<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Perte ou dommage<\/span><\/strong><\/td><td><span style=\"color:#e5a400\" class=\"has-inline-color\">D\u00e9clarer la partie responsable de la perte ou de l'endommagement pendant le transport.<\/span><\/td><\/tr><tr><td><strong>Autres termes<\/strong><\/td><td>Pi\u00e8ce jointe<\/td><td>Photos de produits, feuilles de couleurs, fichiers de conception, etc.<\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#f23400\" class=\"has-inline-color\">Cessation d'activit\u00e9<\/span><\/strong><\/td><td><span style=\"color:#f23400\" class=\"has-inline-color\">Si le fournisseur ne remplit pas ses obligations au titre du contrat, il doit pr\u00e9ciser les modalit\u00e9s de r\u00e9siliation du contrat.<\/span><\/td><\/tr><tr><td><\/td><td><strong><span style=\"color:#e5a400\" class=\"has-inline-color\">Les litiges<\/span><\/strong><\/td><td>En cas de litige, <span style=\"color:#008cc4\" class=\"has-inline-color\">les deux parties consentent \u00e0 ce que toutes les proc\u00e9dures se d\u00e9roulent en R\u00e9publique populaire de Chine<\/span>.<\/td><\/tr><tr><td><\/td><td>Validit\u00e9<\/td><td>Dur\u00e9e de validit\u00e9<\/td><\/tr><tr><td><\/td><td>Signature<\/td><td>La signature du repr\u00e9sentant du fournisseur<\/td><\/tr><tr><td><\/td><td>Tampon<\/td><td>Utiliser le tampon rond rouge<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-2-initial-production-inspection\">2. Initial production inspection<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/mysourcify.com\/wp-content\/uploads\/2020\/07\/initial-production-inspection-1024x683.jpg\" alt=\"initial production inspection\" class=\"wp-image-5132\"\/><figcaption class=\"wp-element-caption\">l'inspection initiale de la production<\/figcaption><\/figure>\n\n\n\n<p>If you cannot visit the factory in person, you should entrust a third party to conduct the checking on your behalf. However, even if you don&#8217;t hire an inspector right away, you can still control your supply chain remotely by taking these steps:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Request a copy of the raw material purchase list before production starts, and ask for photos of the raw materials sitting in their warehouse.<\/li>\n\n\n\n<li>Ask for a strict production schedule. Knowing the production cycle helps you track the lead time effectively.<\/li>\n\n\n\n<li>Have them send you photos of the production workshop. This gives you an opportunity to understand their management style and professionalism.<\/li>\n\n\n\n<li>Confirm that the pre-production preparation is underway exactly as prescribed in the schedule.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-3-inline-inspection\">3. Inline inspection<\/h3>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-28f84493 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/mysourcify.com\/wp-content\/uploads\/2020\/07\/inline-inspection.jpg\" alt=\"inline inspection\" class=\"wp-image-5134\"\/><figcaption class=\"wp-element-caption\">inspection en ligne<\/figcaption><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/mysourcify.com\/wp-content\/uploads\/2020\/07\/inline-inspection-2-1-1024x683.jpg\" alt=\"inline inspection-2\" class=\"wp-image-5135\"\/><figcaption class=\"wp-element-caption\">inspection en ligne-2<\/figcaption><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p>Inline production inspection usually happens when the order is about <strong>20% fulfilled<\/strong>. Again, if you cannot be there, hire a third-party inspector. Commonly, this inspection is performed using the ANSI\/ASQC Z1.4 (ISO 2859-1) standard.<\/p>\n\n\n\n<p>The goals of an inline inspection are:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>To check if the cargoes are being produced according to the PO (specifications, quantity, and packaging).<\/li>\n\n\n\n<li>To check the efficiency of the ongoing production line and verify if they can realistically meet your deadline based on their daily volume.<\/li>\n\n\n\n<li>To pull a random mass production sample and compare it directly with your approved Pre-Production (PP) sample.<\/li>\n\n\n\n<li>To check the defect rate early, to avoid a massive batch of inferior products at the end.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"h-4-pre-shipment-inspection\">4. Inspection avant exp\u00e9dition<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/mysourcify.com\/wp-content\/uploads\/2020\/07\/pre-shipment-inspection.jpg\" alt=\"pre-shipment inspection\" class=\"wp-image-5136\"\/><figcaption class=\"wp-element-caption\">inspection avant exp\u00e9dition<\/figcaption><\/figure>\n\n\n\n<p>The Pre-Shipment Inspection (PSI) is an indispensable part of the importing process. Problems detected at the factory can be easily reworked by the supplier. Finding these same issues after the <span style=\"box-sizing: border-box; margin: 0px; padding: 0px;\"><a href=\"https:\/\/mysourcify.com\/fr\/shipping-containers\/\" target=\"_blank\">container<\/a><\/span>\u00a0arrives at your local port is a costly disaster.<\/p>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td><strong>Crit\u00e8res de qualit\u00e9<\/strong><\/td><td><strong>Listes de contr\u00f4le<\/strong><\/td><\/tr><tr><td><strong>Quantit\u00e9<\/strong><\/td><td>a. Nombre de pi\u00e8ces par bo\u00eete ou carton<br>b. Nombre total de bo\u00eetes ou de cartons<br>c. Quantit\u00e9 totale<\/td><\/tr><tr><td><strong>Dimensions<\/strong><\/td><td>a. Hauteur<br>b. Largeur<br>c. Longueur<br>d. Diam\u00e8tre<br>e. \u00c9paisseur, etc.<\/td><\/tr><tr><td><strong>Poids et volume<\/strong><\/td><td>a. Poids net<br>b. Poids brut<br>c. Taille de la bo\u00eete ou du carton<\/td><\/tr><tr><td><strong>Couleur<\/strong><\/td><td>Joindre la photo de la d\u00e9couverte actuelle<\/td><\/tr><tr><td><strong>Aspect du produit<\/strong><\/td><td>Comparaison avec l'\u00e9chantillon PP<\/td><\/tr><tr><td><strong>Fonction et performance du produit<\/strong><\/td><td>a. Test d'usage<br>b. R\u00e9sistance \u00e0 l'eau<br>c. R\u00e9sistance \u00e0 la poussi\u00e8re<br>d. Essais m\u00e9caniques, etc.<\/td><\/tr><tr><td><strong>\u00c9tiquettes et marques<\/strong><\/td><td>\u00c9tiquettes et marques d'exp\u00e9dition<\/td><\/tr><tr><td><strong>Paquet<\/strong><\/td><td>a. bo\u00eete de vente<br>b. concevoir des \u0153uvres d'art<br>c. prot\u00e8ge les mousses (le cas \u00e9ch\u00e9ant)<br>d. la langue, etc.<\/td><\/tr><tr><td><strong>Collecte d'\u00e9chantillons<\/strong><\/td><td>Recommander de pr\u00e9lever un \u00e9chantillon pour chaque \u00e9l\u00e9ment<\/td><\/tr><tr><td><strong>Test et exigences particuli\u00e8res<\/strong><\/td><td>N\/A<\/td><\/tr><tr><td><strong>Emballage ext\u00e9rieur<\/strong><\/td><td>a. <a href=\"https:\/\/mysourcify.com\/fr\/packaging-for-a-product\/\" target=\"_blank\" rel=\"noreferrer noopener\">Outer cartons<\/a><br>b. Bo\u00eetes int\u00e9rieures<br>c. Protection<br>d. Palettes ou sacs textiles<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-style-default is-layout-flow wp-block-quote-is-layout-flow\">\n<p><em>We highly suggest sending a third-party inspector to the factory to report back with a professional inspection sheet. Remember, this inspection doesn&#8217;t check every single product one by one; it checks the average quality by picking random samples.<\/em><\/p>\n<\/blockquote>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-tips\">5 Expert Tips for Bulletproof Quality Control<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Dual-Language Contracts<\/strong><\/h3>\n\n\n\n<p>A contract is your ultimate tool. To eliminate any language misunderstandings, we strongly suggest signing contracts drafted in both English and Chinese.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>The Power of the Red Stamp<\/strong><\/h3>\n\n\n\n<p>This is critically important in China. You must ensure the supplier stamps the contract with their <strong>official red round seal<\/strong>. A red seal is registered with the government and legally binding under Chinese law. A blue seal or a simple signature often holds no legal weight.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Ask for a Fingerprint<\/strong><\/h3>\n\n\n\n<p>Having the supplier&#8217;s legal representative sign and press their fingerprint on the contract is even better. Fingerprints carry strong legal authority in China, and local businesspeople are accustomed to this practice. It is a great way to gauge their sincerity.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Use Objective Third Parties<\/strong><\/h3>\n\n\n\n<p>For Initial and Inline inspections, an objective third-party company is your best bet. If you are on a tight budget, explicitly demand that the factory&#8217;s internal QC team sends you a detailed inspection report with photos.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Hold the Leverage<\/strong><\/h3>\n\n\n\n<p>Never wire the final balance payment bluntly. If it is a new supplier, order a Pre-Shipment Inspection. You make the decision to approve shipping or demand re-working based <em>only<\/em> on that report. Once the goods leave the factory and the balance is paid, it is incredibly difficult to force a Chinese supplier to take responsibility for defects.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote is-style-default is-layout-flow wp-block-quote-is-layout-flow\">\n<p><em><em>We hope you find this guide helpful for your importing business! If you need a reliable partner on the ground to draft bilingual contracts, audit factories, or conduct professional quality control inspections, the team at <strong>My Sourcify<\/strong> is here to help. Leave your questions in the comments below!<\/em><\/em><\/p>\n\n\n\n<p><\/p>\n<\/blockquote>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Here we finally get to the most critical part: making sure the supplier actually produces your goods exactly as expected. It is common for some Chinese suppliers to agree to every single request before receiving your order and deposit. But once production starts, things can easily spiral out of control. Once you pay the deposit, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[36,37,53],"class_list":["post-5126","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-china-sourcing-tips","tag-import-from-china","tag-importing-from-china","tag-production-quality-control"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mysourcify.com\/fr\/production-and-quality-control-importing-from-china-course-step-4\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify\" \/>\n<meta property=\"og:description\" content=\"Here we finally get to the most critical part: making sure the supplier actually produces your goods exactly as expected. It is common for some Chinese suppliers to agree to every single request before receiving your order and deposit. But once production starts, things can easily spiral out of control. Once you pay the deposit, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mysourcify.com\/fr\/production-and-quality-control-importing-from-china-course-step-4\/\" \/>\n<meta property=\"og:site_name\" content=\"My Sourcify\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-23T07:40:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T07:43:59+00:00\" \/>\n<meta name=\"author\" content=\"Mia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/\"},\"author\":{\"name\":\"Mia\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#\\\/schema\\\/person\\\/5ba90b6579b7e605967c13599e28697c\"},\"headline\":\"Production &amp; Quality Control-Importing from China Course Step 4 (2026)\",\"datePublished\":\"2020-07-23T07:40:00+00:00\",\"dateModified\":\"2026-06-12T07:43:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/\"},\"wordCount\":1435,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#primaryimage\"},\"thumbnailUrl\":\"\",\"keywords\":[\"Import from China\",\"Importing from China\",\"Production Quality Control\"],\"articleSection\":[\"China Sourcing Tips\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/\",\"url\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/\",\"name\":\"Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#primaryimage\"},\"thumbnailUrl\":\"\",\"datePublished\":\"2020-07-23T07:40:00+00:00\",\"dateModified\":\"2026-06-12T07:43:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#primaryimage\",\"url\":\"\",\"contentUrl\":\"\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/production-and-quality-control-importing-from-china-course-step-4\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mysourcify.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Production &amp; Quality Control-Importing from China Course Step 4 (2026)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#website\",\"url\":\"https:\\\/\\\/mysourcify.com\\\/\",\"name\":\"My Sourcify\",\"description\":\"Finding reliable suppliers and managing smooth production can be challenging. Mysourcify handles everything \u2014 from supplier sourcing to global delivery.\",\"publisher\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mysourcify.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#organization\",\"name\":\"My Sourcify\",\"url\":\"https:\\\/\\\/mysourcify.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mysourcify.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/iconoplg.png\",\"contentUrl\":\"https:\\\/\\\/mysourcify.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/iconoplg.png\",\"width\":300,\"height\":300,\"caption\":\"My Sourcify\"},\"image\":{\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mysourcify.com\\\/#\\\/schema\\\/person\\\/5ba90b6579b7e605967c13599e28697c\",\"name\":\"Mia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g\",\"caption\":\"Mia\"},\"sameAs\":[\"http:\\\/\\\/mysourcify.com\"],\"url\":\"https:\\\/\\\/mysourcify.com\\\/fr\\\/author\\\/gordonlinkyiwu-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mysourcify.com\/fr\/production-and-quality-control-importing-from-china-course-step-4\/","og_locale":"fr_FR","og_type":"article","og_title":"Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify","og_description":"Here we finally get to the most critical part: making sure the supplier actually produces your goods exactly as expected. It is common for some Chinese suppliers to agree to every single request before receiving your order and deposit. But once production starts, things can easily spiral out of control. Once you pay the deposit, [&hellip;]","og_url":"https:\/\/mysourcify.com\/fr\/production-and-quality-control-importing-from-china-course-step-4\/","og_site_name":"My Sourcify","article_published_time":"2020-07-23T07:40:00+00:00","article_modified_time":"2026-06-12T07:43:59+00:00","author":"Mia","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Mia","Dur\u00e9e de lecture estim\u00e9e":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#article","isPartOf":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/"},"author":{"name":"Mia","@id":"https:\/\/mysourcify.com\/#\/schema\/person\/5ba90b6579b7e605967c13599e28697c"},"headline":"Production &amp; Quality Control-Importing from China Course Step 4 (2026)","datePublished":"2020-07-23T07:40:00+00:00","dateModified":"2026-06-12T07:43:59+00:00","mainEntityOfPage":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/"},"wordCount":1435,"commentCount":0,"publisher":{"@id":"https:\/\/mysourcify.com\/#organization"},"image":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#primaryimage"},"thumbnailUrl":"","keywords":["Import from China","Importing from China","Production Quality Control"],"articleSection":["China Sourcing Tips"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/","url":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/","name":"Production &amp; Quality Control-Importing from China Course Step 4 (2026) - My Sourcify","isPartOf":{"@id":"https:\/\/mysourcify.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#primaryimage"},"image":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#primaryimage"},"thumbnailUrl":"","datePublished":"2020-07-23T07:40:00+00:00","dateModified":"2026-06-12T07:43:59+00:00","breadcrumb":{"@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#primaryimage","url":"","contentUrl":""},{"@type":"BreadcrumbList","@id":"https:\/\/mysourcify.com\/production-and-quality-control-importing-from-china-course-step-4\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mysourcify.com\/"},{"@type":"ListItem","position":2,"name":"Production &amp; Quality Control-Importing from China Course Step 4 (2026)"}]},{"@type":"WebSite","@id":"https:\/\/mysourcify.com\/#website","url":"https:\/\/mysourcify.com\/","name":"My Sourcify","description":"Finding reliable suppliers and managing smooth production can be challenging. Mysourcify handles everything \u2014 from supplier sourcing to global delivery.","publisher":{"@id":"https:\/\/mysourcify.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mysourcify.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/mysourcify.com\/#organization","name":"My Sourcify","url":"https:\/\/mysourcify.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/mysourcify.com\/#\/schema\/logo\/image\/","url":"https:\/\/mysourcify.com\/wp-content\/uploads\/2026\/01\/iconoplg.png","contentUrl":"https:\/\/mysourcify.com\/wp-content\/uploads\/2026\/01\/iconoplg.png","width":300,"height":300,"caption":"My Sourcify"},"image":{"@id":"https:\/\/mysourcify.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mysourcify.com\/#\/schema\/person\/5ba90b6579b7e605967c13599e28697c","name":"Mia","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/secure.gravatar.com\/avatar\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c4b29ec7e892f4f6acc07e5669f651ff4dc10cb5e80ee5fe327246dc761cba90?s=96&d=mm&r=g","caption":"Mia"},"sameAs":["http:\/\/mysourcify.com"],"url":"https:\/\/mysourcify.com\/fr\/author\/gordonlinkyiwu-com\/"}]}},"_links":{"self":[{"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/posts\/5126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/comments?post=5126"}],"version-history":[{"count":1,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/posts\/5126\/revisions"}],"predecessor-version":[{"id":15238,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/posts\/5126\/revisions\/15238"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/"}],"wp:attachment":[{"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/media?parent=5126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/categories?post=5126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mysourcify.com\/fr\/wp-json\/wp\/v2\/tags?post=5126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}